CS605 (Software Engineering-II) Quiz 2 (Ch# 23 to 33)

Question 01 of 10

_________ are mechanisms that lead to prevention of potential quality problem before it occurs or its rapid detection if introduced.

Select the correct option:

  • Mistake-Profiling
  • Mistake-Proofing
  • Mistake-Provoking
  • Mismanagement-Proofing


Question 02 of 10

In a review, the _________ should be panted out gently and the tone should be loose and constructive

Select the correct option:

  • Inputs
  • Outputs
  • Cardamom
  • Errors

 

Question 03 of 10

A quantitative quality measuring technique that helps to uncover root cause for an error and then work on to what was traced is called ______.

Select the correct option:

  • Non-Statistical Software Quality Assurance
  • Formal Technical Review
  • Walkthroughs
  • Statistical Software Quality Assurance

 

Question 04 of 10

A/An ______ is used to fine tune the product by fixing minor product defects.

Select the correct option:

  • Deployment
  • Upgrade
  • Enhancement
  • Update

 

Question 05 of 10

Defining a “Task Network" helps in defining:

Select the correct option:

  • Sequence in which activities will be performed
  • Cost of the project
  • The resources required for project
  • Third party tools required for project

 

Question 06 of 10

Software configuration management tasks include Identification, Version Control, Change Control, Configuration Auditing and

Select the correct option:

  • Testing
  • Debugging
  • Designing
  • Reporting

 

Question 07 of 10

if:

E = Errors found before shipment
D = Errors found during operation
Then Defect Removal Efficiency (DRE) is equal to:

Select the correct option:

  • DRE = E + (E+D)
  • DRE = E / (E+D)
  • DRE = E - (E+D)
  • DRE = E * (E+D)

Question 08 of 10

_________ serve as the starting point for further development and by helping us to control change without seriously impeding justifiable change.

Select the correct option:

  • Full Version
  • Change Control
  • Mistake-Proofing
  • Baseline

 

Question 09 of 10

The progress on a project at any given point in time can be calculated by:

Select the correct option:

  • Multiplying all the BCWS till that point for all tasks
  • Adding all the BCWS till that point for all tasks
  • Adding BCWS and EVA for all tasks till that point
  • Dividing all the BCWS till that point for all tasks

 

Question 10 of 10

The purpose of Software Configuration Management is to establish and maintain the __________ of software products through the project's life cycle.

Select the correct option:

  • Integrity
  • Portability
  • Efficiency
  • Interoperability

 

CS605 - Software Engineering - II important MCQ's Quiz 2

(2nd Attempt)

 

Question 01 of 10

__________ reviews the process description (or compliance with the organizational policies, standards and other parts of the software project plan.

Select the correct option:

  • Cost of Quality
  • Quality Control
  • Quality planning
  • Software Quality Assurance (SQA) group

 

Question 02 of 10

The Review porticipants SHOULD NOT be focused on _________.

Select the correct option:

  • Review agenda
  • Time lines
  • Weaknesses of the developer
  • Work product

 

Question 02 of 10

The equation to find out the Availability of software is:

Select the correct option:

  • Availability = (MTTF - MTBF) x 100
  • Availability = (MTTF x MTBF) / 100
  • Availability = (MTTF / MTBF) x 100
  • Availability = (MTTF * MTBF) x 100