CS605 (Software Engineering-II) Quiz 2 (Ch# 23 to 33)
Question 01 of 10
_________ are mechanisms that lead to prevention of potential quality problem before it occurs or its rapid detection if introduced.
Select the correct option:
- Mistake-Profiling
- Mistake-Proofing
- Mistake-Provoking
- Mismanagement-Proofing
Question 02 of 10
In a review, the _________ should be panted out gently and the tone should be loose and constructive
Select the correct option:
- Inputs
- Outputs
- Cardamom
- Errors
Question 03 of 10
A quantitative quality measuring technique that helps to uncover root cause for an error and then work on to what was traced is called ______.
Select the correct option:
- Non-Statistical Software Quality Assurance
- Formal Technical Review
- Walkthroughs
- Statistical Software Quality Assurance
Question 04 of 10
A/An ______ is used to fine tune the product by fixing minor
product defects.
Select the correct option:
- Deployment
- Upgrade
- Enhancement
- Update
Question 05 of 10
Defining a “Task Network" helps in defining:
Select the correct option:
- Sequence in which activities will be performed
- Cost of the project
- The resources required for project
- Third party tools required for project
Question 06 of 10
Software configuration management tasks include
Identification, Version Control, Change Control, Configuration Auditing and
Select the correct option:
- Testing
- Debugging
- Designing
- Reporting
Question 07 of 10
if:
E = Errors found before shipment
D = Errors found during operation
Then Defect Removal Efficiency (DRE) is equal to:
Select the correct option:
- DRE = E + (E+D)
- DRE = E / (E+D)
- DRE = E - (E+D)
- DRE = E * (E+D)
Question 08 of 10
_________ serve as the starting point for further
development and by helping us to control change without seriously impeding
justifiable change.
Select the correct option:
- Full Version
- Change Control
- Mistake-Proofing
- Baseline
Question 09 of 10
The progress on a project at any given point in time can be
calculated by:
Select the correct option:
- Multiplying all the BCWS till that point for all tasks
- Adding all the BCWS till that point for all tasks
- Adding BCWS and EVA for all tasks till that point
- Dividing all the BCWS till that point for all tasks
Question 10 of 10
The purpose of Software Configuration Management is to
establish and maintain the __________ of software products through the
project's life cycle.
Select the correct option:
- Integrity
- Portability
- Efficiency
- Interoperability
CS605 - Software Engineering - II
important MCQ's Quiz 2
(2nd Attempt)
Question 01 of 10
__________ reviews the process description (or compliance
with the organizational policies, standards and other parts of the software
project plan.
Select the correct option:
- Cost of Quality
- Quality Control
- Quality planning
- Software Quality Assurance (SQA) group
Question 02 of 10
The Review porticipants SHOULD NOT be focused on _________.
Select the correct option:
- Review agenda
- Time lines
- Weaknesses of the developer
- Work product
Question 02 of 10
The equation to find out the Availability of software is:
Select the correct option:
- Availability = (MTTF - MTBF) x 100
- Availability = (MTTF x MTBF) / 100
- Availability = (MTTF / MTBF) x 100
- Availability = (MTTF * MTBF) x 100
0 Comments